Generally it again depends on the size of the project but we can say that a project with 8 to 12 visualizations takes approximately 2 to 5 weeks’ time.
The most important factor here is the level of information available for us to start the project. We never recommend to engage a Visualization agency before the design is freezed or finalized.
For quick turnaround we request to provide all the information before the starting of the project. These details can be design, source files, colour, material, texture details etc.